Link generated reports automatically

PlantReporter can link every report it creates to the element it was made for: the object, the drawing, the drawing folder or the project - the report configuration's Output Type decides which, see Enable linking reports. It is switched on per report configuration. Here one report is linked to each drawing and one to the project.

  1. In PlantReporter, choose a report configuration that links its reports and has the Output Type One report / drawing. Check the drawings in the drawing tree and click Print/Export.

  2. In the question Link report to project, choose Link the report. Do not link the report leaves the reports of this print unlinked. A report configuration that creates a version or revision does not ask: keep Link report to project ticked in the version dialog instead.

  3. Open the Docs tab and select one of the drawings in the drawing tree: its own report is listed (see Docs Tab). Each drawing is linked only to the report made for it.

  4. Choose a report configuration with the Output Type One report / project, click Print/Export and choose Link the report again.

  5. In AutoCAD Plant 3D, open the Documents node in PlantProjectManager: the report is listed as a document of the project (see Documents Node).

The reports are listed wherever their drawing's or the project's documents are shown - also in the Docs tab of PlantExpressTools and PlantDataManager. From the command line, /LINK ON and /LINK OFF decide for the run without a question. Reports linked to drawing folders or objects are set up the same way, see Enable linking reports.