Enable linking reports
PlantReporter can link every report it creates to the element of the project it was made for: the project, a drawing folder, a drawing or an object. The report then shows up wherever that element's documents are listed - in the Docs tab of the Properties palette, in PlantProjectManager and in PlantReporter's own Docs tab (see Docs Tab). Linking is switched on per report configuration; its Output Type decides what a report is linked to.
In PlantReporter, choose the report configuration and click Edit....

Under Documents, tick Link generated reports to the project. The section is hidden while Document Linking is deactivated for the project (see Settings).

Under Output Type, choose what each report is linked to: One report / object links it to its object, One report / drawing to its drawing, One report / project to the project.

To link reports to drawing folders, keep One report / project and put
[FOLDER]into the Export file path, e.g.[PP]\Reports\[FOLDER]-[RCF].pdf- it is replaced by the folder's name. PlantReporter then writes one file for each folder checked on the Drawing Data tab and links each one to its folder; the rows of drawings that lie in no folder go into one more file, linked to the project. On the Project Data tab, and with a query whose result does not tell which drawing a row comes from, one file is written and linked to the project.
With One report / drawing or One report / object, All reports in one file writes one combined file instead of one file each. That file is linked to every drawing or object whose pages it holds.

Click OK. When you click Print/Export, PlantReporter asks whether to link the report. To skip the question with a fixed answer, tick Do not show dialog 'Link report to project' in the Settings.
Every report this configuration creates is now linked; a report sent to the printer creates no file and is not linked. Package generated reports with the linked documents of and Merge linked PDF documents into the report PDF, in the same section, put the linked documents into the report - see Create Report Configuration. How the linked reports are created and where you find them: Link generated reports automatically.
Last updated